ZoningLedger
3,142 JURISDICTIONS • ENGINE LIVE
SHEET 02.3 / RECORD DETAIL
SCALE N.T.S.
County Zoning & Off-Grid Compliance Record

Hood River County, Oregon

Forested foothill parcels with permissive THOW and cabin allowances. Six structure types actively tracked, most recently re-verified 2026-07-07.

6
STRUCTURE TYPES TRACKED
611
VERIFIED RECORDS
NOT REQUIRED
GRID-TIE MANDATORY
2026-07-07
LAST VERIFIED
FIG. 03 — DATA SCHEMA

Data Vectors for This Jurisdiction

Structural parameters as normalized from Hood River County planning code, current as of the last verification cycle.

Vector What It Covers Value
Max Structural Dimensions Height cap for tiny homes on wheels and park-model accessory structures. max_height_ft: 16
Setback Profiles Rear boundary requirement, forested foothill parcel classification. rear_setback_ft: 10
Core Occupancy Rules Minimum habitable floor area for a permitted permanent dwelling. min_habitable_sqft: 150
Regional Eco-Compliance Mandates Grid-tie connection is optional; county allows fully off-grid solar and battery systems. grid_tie_required: false
FIG. 04 — STRUCTURE PERMIT MATRIX

Permit Status by Structure Type

Structure Type Permit Status Grid-Tie Mandatory Last Verified
Tiny Home (THOW) APPROVED Not Required 2026-07-07
Off-Grid Cabin APPROVED Not Required 2026-06-30
Accessory Dwelling Unit APPROVED Not Required 2026-06-24
Composting Toilet APPROVED N/A 2026-06-11
Earthship / Rammed Earth CONDITIONAL Not Required 2026-05-27
Rainwater Catchment System APPROVED Not Required 2026-05-02
FIG. 05 — MACHINE RECORD
Cite This Record

This page has a machine-readable counterpart

AI agents and crawlers can pull this exact record as token-dense markdown without rendering HTML. See the full API docs →

GET /jurisdictions/hood-river-county-or.md
Content-Type: text/markdown
Record ID: row-hood-river-or
Last-Verified: 2026-07-07